Store is closed. Anyone looking for information or lessons are asked to call the office.

Swimmer 6

$52.00

Swimmer 6: These advanced swimmers will rise to the challenge of sophisticated aquatic skills including stride entries, compact jumps and lifesaving kicks like eggbeater and scissor kick. They’ll develop strength and power in head-up breaststroke sprints over 25 m. They’ll easily swim lengths of front crawl, back crawl, and breaststroke, and they’ll complain about the 300 m workout.

SKU: LS-SW-06 Category: Tag:

Description

AT-A-GLANCE
The Lifesaving Society’s 6-level Swimmer program makes sure your children learn how to swim before they get in too deep. Swimmer progressions accommodate children 5 years and older including absolute beginners as well as swimmers who want to build on the basics.

We stress lots of in-water practice to develop solid swimming strokes and skills. We incorporate Water Smart® education in all levels.

We’ve organized the content of each level like this:

Entries and exits
Surface support
Underwater skills
Swim to Survive® skills
Movement / Swimming skills
Fitness
Water Smart® education
As an integral part of the Swim for Life® program, Water Smart education provides information and experiences that helps participants make smart decisions when in, on and around water and ice.

Swimmer 6: These advanced swimmers will rise to the challenge of sophisticated aquatic skills including stride entries, compact jumps and lifesaving kicks like eggbeater and scissor kick. They’ll develop strength and power in head-up breaststroke sprints over 25 m. They’ll easily swim lengths of front crawl, back crawl, and breaststroke, and they’ll complain about the 300 m workout.

swimmer at-a-glance

Additional information

Blocks

Block # 1, Block # 2, Block # 3