Swimmer

Store is closed. Anyone looking for information or lessons are asked to call the office.
  • Swimmer 1

    Swimmer 1

    $52.00

    Swimmer 1: These beginners will become comfortable jumping into the water with and without a lifejacket. They’ll learn to open their eyes, exhale and hold their breath underwater. They’ll work on floats, glides, and kicking through the water on their front and back.

     

    Select options
  • Swimmer 2

    Swimmer 2

    $52.00

    Swimmer 2: These advanced beginners will jump into deeper water, and learn to be comfortable falling sideways into the water wearing a lifejacket. They’ll be able to support themselves at the surface without an aid, learn whip kick, swim 10 m on their front and back, and be introduced to flutter kick interval training (4 x 5 m).

     

     

     

    Select options
  • Swimmer 3

    Swimmer 3

    $52.00

    Swimmer 3: These junior swimmers will dive and do in-water front somersaults and handstands. They’ll work on 15 m of front crawl, back crawl and 10 m of whip kick. Flutter kick interval training increases to 4 x 15 m.

    Select options
  • Swimmer 4

    Swimmer 4

    $52.00

    Swimmer 4: These intermediate swimmers will swim 5 m underwater and lengths of front, back crawl, whip kick, and breaststroke arms with breathing. Their new bag of tricks includes the completion of the Canadian Swim to Survive® Standard. They’ll cap it all off with front crawl sprints over 25 m and 4 x 25 m front or back crawl interval training.

     

    Select options
  • Swimmer 5

    Swimmer 5

    $52.00

    Swimmer 5: These swimmers will master shallow dives, cannonball entries, eggbeater kicks, and in-water backward somersaults. They’ll refine their front and back crawl over 50 m swims of each, and breaststroke over 25 m. Then they’ll pick up the pace in 25 m sprints and two interval training bouts: 4 x 50 m front or back crawl; and 4 x 15 m breaststroke.

     

    Select options
  • Swimmer 6

    Swimmer 6

    $52.00

    Swimmer 6: These advanced swimmers will rise to the challenge of sophisticated aquatic skills including stride entries, compact jumps and lifesaving kicks like eggbeater and scissor kick. They’ll develop strength and power in head-up breaststroke sprints over 25 m. They’ll easily swim lengths of front crawl, back crawl, and breaststroke, and they’ll complain about the 300 m workout.

    Select options